Ports description
Ports Situation
Oil Terminals
Ports arrival check-list
Inland Transport
Projects Development
Newsletters
Contacts
 

Mozambique – Maputo :
On Friday 3rd Sept. 11:30 rumors of new riots rose and it has been decided (all shipping agencies and FFws) to close the office until 06/09/2010. General Cargo Vessel have stopped operations. Container vessels have started back operation this morning (03/09/2010) and a minimum service will be provided over the week-end.
 
End of Ramadan :
Approximately 10 , 11, 12 September.


31-32 quai de Dion-Bouton
92811 Puteaux Cedex
Phone: (33) 1 46 96 42 84
Fax:     (33) 1 46 96 40 96
Mail : afritramp@bollore.com
 
 
31-32 quai de Dion-Bouton
92811 Puteaux Cedex
Phone : (33) 1 46 96 42 84
Fax : (33) 1 46 96 40 96
Mail : afritramp@bollore.com
Ports description
 
 
Tunisia  

Rades Sal Ines map port

Rades Sal Ines port facilities

Bizerte-Menzel Bourguiba map port

Bizerte-Menzel Bourguiba port facilities

Sousse map port

Sousse port facilities

Sfax map port

Sfax port facilities

Gabes map port

Gabes port facilities

Zarzis map port

Zarzis port facilities

La Goulette map port

La Goulette port facilities

 > Radès Sal Ines map port

 Map reference number and Description

Length (m)

Draught (m)

2 to 3

Roro

180

9 - 9.15

2 to 3

Containers ships

180

9

 

1 Oil/gas tankers - fluid-bulk carriers (tanks)

170

9.45

 

1 Cereal carrier (silo)

190

9.75

 

1 Bitumen carriers, ore tankers and fluid-bulk carrier

160

9.45

 

1 Conventional bulk carrier

120

7.20

 

1 Conventional

130

7.20

The canal basin covering a surface of 63.6 hectares separates the port installations of the northern bank from those of the southern bank. This basin, initially dredged at -12 meters, comprises - A turning circle exterior to the central basin, with a diameter of 370 meters, dredged at -12 meters, is fitted out below the port’s access channel - A turning circle with a diameter of 300 meters is located at the level of specialized dock posts of the southern bank.

 The access to the terminal goes through the main basin of the port of La Goulette and then through a channel dredged at -12 meters and with head room of 42 meters.

 The terminal basin : the man-made lake of the terminal basin has a surface of 80 ha and a turning circle of 400 meters. The basin is dredged at -10.50 meters.

Fresh water density : 1.025 / ISPS : Level 1 / Private stevedoring. / Weather : Northern Tunisia has a Mediterranean climate, with mild, rainy winters and hot, dry summers.

 Click to enlarge   Click to enlarge   Click to enlarge

 

Top of page

>Radès Sal Ines port facilities

 >> Storage capacities

Bonded warehouses

48 ha

Covered  storage area

47 ha

Warehouses

3 ha

 >> Stevedoring equipement

 

Quantity

Pneumatic cranes

4

Lifting trackles

14

Reach stackers

8

Roro trucks

33

Patrol boats

3

>> Other facilities

 

Yes/no

Bunkering

Yes

Water

Yes

Slops

Yes

Shipchandler

Yes

Shipyard

Yes

Top of page

 

> Bizerte-Menzel Bourguiba map port

 Map reference number and Description

Length (m)

Draught (m)

BIZERTE :     

1

Ordinary posts commercial dock (5 berths)

520

9.8

2

Specialized posts oil A

250

10.67

3

Specialized posts oil B

150

8.25

4

Cereals (with modern silo)

200

9.75

5

Tunis Acier (Steel)

120

9

6

Cement works (13 berths)

180 or 185

10.5

7

Supporting equipment

120

5.50

8

Oxy dock

16

6.20

MENZEL BOURGUIBA :       

 9

"North" Dock

220

5

 10

"Honour" Dock

100

5.50

 11

"South" Dock

150

9.50

The access to the commercial docks and to the basin of Menzel Bourguiba is by way of a channel crossed by a movable bridge and offers a passage of 75m wide with a draft of 13m. /  Fresh water density : 1.025 / ISPS : Level 1 /  Private stevedoring.

Click to enlarge   Click to enlarge   Click to enlarge

Top of page

> Bizerte-Menzel Bourguiba port facilities

>> Storage capacities

Bonded warehouses

6,548 sqm

Open air storage areas

22,000 sqm

Covered  storage area

2,066 sqm

 >> Stevedoring equipement

 

Quantity

Capacity

Tug boats

2

3,600 hp

Patrol boat

1

 

Mobile cranes

1

8 T

Suction devices

3

200 T/H

Loading devices with conveyor (cement, clinker)

2

 350 - 600 T/H

Gantry cranes

2

 32 T

 >> Other facilities

 

Yes/no

Bunkering

Yes

Water

Yes

Slops

Yes

Shipchandler

Yes

Shipyard

Yes

Top of page

 

 > Sousse map port

Access to the port :  The maximum authorized ship length in the port is 165 meters.The maximum authorized draft is 8.50 meters on the north bank and 8.20 meters on the south bank.

Piloting : Piloting is obligatory for ships with a tonnage exceeding 300 register tons.

Fresh water : It is supplied at quay by means of hoses and at the request of the captain or the shipping agent.

ISPS : Level 1. / Private stevedoring.

Click to enlarge   Click to enlarge   Click to enlarge

 Top of page

> Sousse port facilities

 >> Stevedoring equipement

 

Quantity

Capacity

Tug boats

1

 1,750 cv

Patrol boats

2

 600 cv

Patrol boats

2

 220 cv

>> Other facilities

 

Yes/no

Bunkering

Yes

Water

Yes

Slops

Yes

Shipchandler

Yes

Shipyard

Yes

 Top of page

 

> Sfax map port

 

 Map reference number and Description

Length (m)

Draught (m)

Basins :  

1

Principal

42

10.5

2

Petroleum

15

10.5

3

Says some sailboats (basin or servitude)

4.25

8.5

Docking works :

4

Ordinary posts commercial (NW) docks

520

10.5

5

Commercial (South) 3 posts at quay and 1 Roro post (150 m)

517

10.5

6

Special oil posts

150

10.5

7

Phosphate posts (North-East)

584

10.5

8

Sulfur posts

220

10.5

9

M'dhilla (North-East)

243

10.5

10

NPK

150

10.5

11

Salt posts

110

10.5

12

Support equipment (South)

95

10.5

Click to enlarge   Click to enlarge   Click to enlarge

Top of page

> Sfax port facilities

 >> Storage capacities

Uncovered platforms

24 ha

Uncovered platforms for storage

9.5 ha

Hangars 1 & 2 (old commercial port)

2,500 sqm

Warehouse (old commercial port)

1,200 sqm

Hangars 1 to 4 (new multipurpose dock)

17,000 sqm

 >> Stevedoring equipement

 

Quantity

Capacity

Tug boats

2

 1,600 / 3,200 hp

Patrol boats

1

 220

Pumping station for bulk oil

2

 
Mobile footbridge for Roro

1

 
Mechanical chargers

2

300 T/H 

Fixed conveyor belt charger

1

350 T/H

Fixed conveyor belt charger

1

1,000 T/H

Electric crane

1

500 T/H

Electric crane

1

90 T/H

Mobile charger

1

250 T/H

>> Other facilities

 

Yes/no

Bunkering

Yes

Water

Yes

Slops

Yes

Shipchandler

Yes

Shipyard

Yes

Top of page

 

> Gabès map port

 

 Map reference number and Description

Length (m)

Draught (m)

1

West dock (posts 5, 6 and 7)

600

10.5

2

North dock (posts 3 and 4)

350

10.5

3

South dock (posts 8, 9 and 10)

780

12.5

4

Support dock

100

5

 The access channel is 130 m wide, 3,200 m long and has a draft of 13 m. / ISPS : level 1 / Private Stevedoring.

Click to enlarge   Click to enlarge

Top of page

 

> Gabès port facilities

  >> Storage capacities

Offices

480 sqm

Hangar

4,000 sqm

Transit Silo

Capacity : 30,000 T

 >> Stevedoring equipement

 

Quantity

Capacity

Tug boats

2

 3,400 / 1,600 cv

Patrol boats

1

 300 cv

Cranes

2

 20 T

Suction gantry

1

300 T/H 

Charger

1

300 T/H

Charger

1

500 T/H

>> Other facilities

 

Yes/no

Bunkering

Yes

Water

Yes

Slops

Yes

Shipchandler

Yes

Shipyard

Yes

Top of page

 

> Zarzis map port

 Map reference number and Description

Length (m)

Draught (m)

1

Commercial dock : Roro, general cargo, bulk cargoes

610

10.5

2

Landing stage : unloading of refined oil products. Ship entry capacity : 20,000 T.

185

9

Access channel : length 9,000 m. - Width 130 m - Depth 13 m / Surface of man-made lake : 35 ha / Mean depth of man-made lake : 12 m / Breakwater with a length of 1,500 m. / ISPS : Level 1 / Private stevedoring.

Click to enlarge   Click to enlarge

Top of page

> Zarzis port facilities

  >> Storage capacities

Port platforms

40 ha

Hangar

5,000 sqm

 >> Stevedoring equipement

 

Quantity

Capacity

Pneumatic crane

 

 25 T

Mobile convoyer belt

1

 
Loading gantry for sea salt

1

 20 T

Pneumatics cranes and forklift trucks of various tonnages  

 

>> Other facilities

 

Yes/no

Bunkering

Yes

Water

Yes

Slops

Yes

Shipchandler

Yes

Shipyard

Yes

 Top of page

 > La goulette map port

The port of La Goulette is the converging point of the main Tunisian road and railroad networks. It is the outlet for a region that is the richest historically, the most diversified culturally, and the most populated, since it comprises the city and the suburbs of Tunis. In addition to its transit and cruise activities, the port of La Goulette also receives ships carrying homogeneous cargos: cars, bulk cereals, various products … However, the development plan of the port provides for its specialization as a port exclusively reserved for passenger and tourist traffic. 

Dredging of the access fairway at 14m and of the canal at -13m for receiving large-size cruise ships. Construction of an additional dock and a reception area for receiving cruise ships under the B.O.T. system.

7 berths - Length : 1090 m. - Draught : 9 m.

Click to enlarge   Click to enlarge

 Top of page

> La goulette port facilities

 >> Storage capacities

Warehouse

35,600 sqm

Platform

25 ha

 >> Stevedoring equipement

 

Quantity

Capacity

Tug boats

2

3,200 hp / 1,600 hp

Patrol boats

3

 
Patrol boats

2

 220 cv

Floating platform – 30m/40m – Simultaneous docking of two ships  

22 T/axle

Telescopic passenger gangways

2

 

Top of page

 

See Contacts

    General country characteristics : http://www.bollore-africa-logistics.com/en/pages-reseau/pays.aspx

 

 


Le contenu de cette page nécessite une version plus récente d’Adobe Flash Player.

Obtenir le lecteur Adobe Flash











          © 2007 Bolloré Group,