Reunion
Le Port Map
Le Port facilities
> Le Port Map (East port & West port)
|
Map reference number and Description
|
Length (m)
|
Draught (m)
|
|
EAST PORT
|
|
|
|
1
|
Container terminal, tankers, feeders (10) |
|
|
|
2
|
Container terminal, feeders (11) |
|
|
|
3
|
General cargo, bulk cargo, car carriers/cruise carriers, general purpose, containerntainer (14, 15) |
|
|
|
|
Tankers, bulk cargo (20 - 21) : Operational only for bulk cargo for the moment |
240
|
14
|
Draught is calculated basis level 0 / Water density : 1,023 / ISPS : Level 1 / Weather : west port channel subject to strong winds and swells. / Private stevedoring.

|
Map reference number and Description
|
Length (m)
|
Draught (m)
|
|
WEST PORT
|
|
|
|
1
|
Fishing industry (3 berths) |
55
|
5.8
|
|
2
|
National Navy (2, 3, 4, 5) |
|
|
|
7
|
Sugar, small cruise liner |
160
|
8.65
|
|
8
|
Cruise liner, tankers (for EDF) |
175
|
8.65
|
|
9
|
Cruise Liner, general cargo |
175
|
8.65
|
|
H
|
Bitumen, cement, gas |
145
|
7.8
|
|
H
|
Gas |
145
|
7.8
|
Draught is calculated basis level 0 / Water density : 1,023 / ISPS : Level 1 / Weather : west port channel subject to strong winds and swells. / Private stevedoring.
- The station 8 and 9 limited to 160 m when gas is alongside at the station H.
- The draught of the acceptable oil tankers to the station n° 8 is limited to 8.25 m.
- The minimal length of the acceptable ships to the station H is 95 m.

Top of page
> Le Port facilities
>> Storage capacities
| EAST PORT |
|
| Container storage area |
10,000 Teus
|
| Warehouse |
6,000 sqm
|
|
Plugs for reefer containers
|
208
|
| Sheltered area |
4,000 sqm
|
| Platform |
3,000 sqm
|
| Border check point |
6 containers entries, 2 inspoections halls, 2 cold storage rooms
|
| WEST PORT |
|
| Sugar terminal |
128,000 T Storage
|
|
Bulk bitumen
|
5 x 540 cu m + 2 x 1,000 cu m tanks
|
| Grain terminal |
350,000 T storage
|
| Fishing terminal : |
|
| - 4 cold rooms (-25°) |
15,900 cu m
|
| - 1 sorting cold rooms (+10°) |
1,730 cu m
|
| - 2 crushed ice production |
30 T
|
>> Stevedoring equipment
| |
Quantity
|
Capacity
|
| Containers gantry crane |
4
|
26 boxes/crane/hour
|
| Forklifts |
34
|
2 T to 12 T
|
| Forklifts |
3
|
40 T
|
| Forklifts |
1
|
45 T
|
| Straddle carrier CSC 450 |
16
|
|
| Wheel crane |
1
|
< 40 T
|
| Wheel tractors |
7
|
|
| Slipway |
1
|
With 6 adjacent dry repair lines for vessel up to 68m L, 800T, 5m draught
|
| Trailers |
8
|
25 T to 60 T
|
| Spreader |
3
|
20' - 40'
|
| Hopper bulk (private owners) |
10
|
|
>> Other facilities
| |
Yes/no
|
|
| Bunkering |
Yes
|
|
| Water |
Yes
|
|
| Slops |
Yes
|
|
| Shipchandler |
Yes
|
|
| Refuelling |
Yes
|
West port for vessel under 175m length, 24m wide & draught under 8.5 m |
| Ship repairs |
No
|
|
| Reefer repairs |
Yes
|
|
| Reefer outlets |
Yes
|
|
Top of page
See Contacts
General country characteristics : http://www.bollore-africa-logistics.com/en/pages-reseau/pays.aspx