Cameroon
Douala port map
Douala port facilities
>> Douala port map
|
Map reference number and Description
|
Length (m)
|
Draught (m)
|
|
1
|
Tankers Temrinal |
140
|
7.3
|
|
2
|
Alumina |
150
|
8.5
|
|
3 to 11
|
Conventional |
150
|
8.5
|
|
12
|
Banana / Fruits |
150
|
8.5
|
|
13
|
Bulk wheat |
150
|
8.5
|
|
14 to 17
|
Containers Terminal (2 gantry cranes) |
150
|
8.5
|
|
51
|
LPG / Bitumen |
130
|
8.5
|
|
52
|
Cement plant |
160
|
8.5
|
Car carriers are calling at the container terminal in priority. If no berth are available, vessels are operated at general cargo berth.
Draught is calculated basis low tide./ Draught allowance is 6.20 m + tide level. Tide variance: 0.30 m (low water) to 2.90 m (high water)/ Fresh water density 1.014 / ISPS : Level 1
Weather : June to August : rainy season. September to November : light rainy season. December to May : Dry season. Private stevedoring.

Top of page
> Douala port facilities
>> Storage capacities
| Bonded warehouses |
52,000 sqm
|
| Air storage |
65,000 sqm
|
| Container storage area |
159,661 sqm
|
| General cargo storage yard |
90,009 sqm
|
|
Plugs for reefer containers
|
120
|
| Cold storage |
8,900 sqm
|
>> Stevedoring equipement
| |
Quantity
|
Capacity
|
| Superstakers |
10
|
45 T
|
| Gantries |
2
|
|
| Crane |
1
|
5 - 20 T
|
| Cranes |
9
|
20 - 40 T
|
| Elevators |
19
|
0 - 3 T
|
| Elevators |
99
|
4 - 7 T
|
| Elevators |
12
|
7 - 12.5 T
|
| Elevators |
5
|
12.5 - 20 T
|
| Elevators |
7
|
28 - 32 T
|
| Elevators |
6
|
32 T
|
| Tugs |
4
|
|
>> Other facilities
| |
Yes/no
|
| Bunkering |
Yes
|
| Water |
Yes
|
| Slops |
No
|
| Shipchandler |
Yes
|
| Shipyard |
Yes
|
Top of page
See Contacts
General country characteristics : http://www.bollore-africa-logistics.com/en/pages-reseau/pays.aspx